Saturday, June 29, 2013


Artista del granito met us at the Neptuno to measure where and how we want the granite. He will cut the main shapes in his workshop and then polish and finish the granite in place. At least the master bath will be installed next week.

Drainage from the balcony was  incorrect and so the concrete on the front cracked. This was repaired.

More cabinets were installed in the kitchen.


The tiles on the bathroom wall in the old maid’s room was “floated” with Bondex so it can be painted.

More window frames were installed. The frame for the sliding glass doors must have had an error because they were lowered over the balcony and taken away.

The water heater was plumbed.

We stopped at a furniture store and priced a bed. This model was good quality wood with a good quality finish. $273.


2 comments:

  1. Do the windows over the patio open? Or just the patio door? Looks like it is coming together.

    ReplyDelete
    Replies
    1. Will post pictures soon of the windows and patio sliders. We're hoping they will be installed this week. Thanks for asking:)

      Delete