Goosebumps. I’m getting goosebumps
seeing how close it is to moving in. Seeing how everything is coming together.
The grout was applied to the tile in
the master bath and the toilet was installed.
Baseboards were installed and Bondex was beveled on the top.
Ceilings were painted and walls were
painted with the first coat of the main color.
Tile patterns were decided for the
guest bath.
Kitchen cabinets were delivered and
installation progressed smoothly.
This is the table saw the carpenters
were using.