Hectic! (Or utter chaos depending on how you look at it.) Tiles, concrete, empasté, electricity, stain, plumbing. All going on today.
Yesterday stones were pried off the balcony column and so it had to have concrete repair and empasté.
Stones and debris are bagged and waiting to go down the ELEVATOR!
Tiles were still making their
way across the floors.
They had to cut the tiles in a line where the sliding glass doors will be installed. This allowed the tiles on the balcony to slope towards the front so rain will run off.
And tiles were cut into strips and installed as baseboards.
Concrete was troweled onto the
kitchen walls getting them ready for cabinet installation.
Jorge applied more empasté onto some
of the walls so that they will be ready for paint.
Electrician assistants were
installing conduits for switch and outlet wiring.
Carpentero moved the door jamb of
the pantry because we will paint that wall instead of tiling it.
Carpentero’s assistant was applying
stain to door jambs.
Drains were readied for tiling. And just in case you couldn’t read
our name, they repainted in grandé letters!
Now we are really welcomed!
No comments:
Post a Comment