Closer and closer! Floor tile is all laid except in the guest bath.

Window frames were installed in about half the windows.





Recessed lighting was installed in living room/dining room.


Refurbished cabinet was installed in master bath.



Kitchen cabinets were installed.


Specialty cabinets were built on site.


Walls were inspected and cracks/dents were repaired.

Accent color was painted (first coat).

Guest bath had more wall tile installed, including on the shower wall.


Water heater was purchased and installed.