Translate

Friday, July 5, 2013


Windows and grout and doors, oh my!

Grout was applied and wiped throughout the rest of the condo and entry.

Doors were hung and trim and doorknobs installed. Mike said there were challenges because the doors were 40 years old so not everything fit well but they got it done.


     Pantry:

      Master bedroom:

     Master bath:

     Bedroom #2:

     Bedroom #3:

     Guest bath:


Toilet was installed in the guest bathroom.

Glass windows were installed in the back room.



Slider doors were installed on the balcony.



Faucets were installed in the master bath shower and the hot water heater turned on and tested. It works! (No blown water pipes either.)

Light bulbs were purchased and put into fixtures.

The door in the entry to the water/electrical shaft was termite infested. Mike originally thought we could treat it for termites, putty holes and repaint it. But we took a closer look today and found that when we pressed on the door, it caved in. So we bought a slab hollow-core door (60cmx200cm) and took it to the condo. When we came back 2 hours later, it was already cut down and installed.
     Before:
     After:



Walls in the entry were painted, including the accent color on the new entry wall.

Thursday, July 4, 2013


We had to go to Guayaquil today to the Immigration office for the second step in obtaining a visitor’s visa.


There was a celebration going on in front of the building (haven’t heard what the occasion was).


The Navy band played John Philip Sousa marches (I'm sure to celebrate the 4th of July).

A little farther up the block there was a demonstration against drugs and a news crew interviewing the leader.


Wednesday, July 3, 2013


Hanging on. 
The painters worked on the front of our balcony today, sealing the concrete and then painting.


The painters also worked on smoothing spots and giving ceilings and walls a second coat.



We talked Jorge into painting this concrete stand that was left by the previous owner. It should make a nice accent piece in the corner next to the front door.


Carpentero sprayed a sealing finish on door jambs and worked on the cabinet in the guest bathroom.

Tiles were cut for entry floor.


Grout was applied on bedroom floor and wiped.


More work was done in the kitchen, a jigsaw was needed for smaller details.



The kitchen sinks were installed. They don't sell a double sink here without a dish drain attached.

The wine rack was delivered and will be installed above the refrigerator.

Can you tell a difference in color between our new windows on the 8th floor and the windows on the floors above us?

Tuesday, July 2, 2013

Tuesday, July 2, 2013


“Your new windows are the wrong color! They have to be black.” “What?”

Julio, the Administrator, told this to Mike this morning. Since we had written a letter to Julio at the beginning of our project telling him what we planned to do, and since Julio said OK then, we said tough luck. When we got to the Neptuno, we compared the windows on our floor to the windows on the other floors and they don’t look different from the street. So Mike talked with Julio and we took him out to show him the windows and he said it would be OK.

The elevator was being worked on again and Julio told them to let us go up, but Mike said we would walk. After walking up 8 flights, we walked out onto our balcony and saw Julio out on the sidewalk with Carlos, the guard, who was talking and gesturing to our condo. Carlos had followed us out with Julio and we told him “Adios” so he wasn’t involved with our conversation. Carlos has constantly told us things that are broken at the building are our fault and we will have to pay. Yesterday, Mike said Carlos had told him we needed a new water meter because it wasn’t registering water use. Our broken pipe also disappeared during the construction and we are pretty sure that Carlos took it because we’ve caught him several times in our condo. (Carlos is the one who met us at the door the night we arrived in Ecuador.) All behaviors which are not appropriate for a guard.

So some of the windows were installed today.


Including the sliding doors on the master balcony.

Drain pipes were installed on the balconies.

Outlets and switches were connected.



Tiles were laid in a pattern on the floor of the guest bathroom.


And the cabinet was put in place.

The shower floor was tiled.


More work was done in the kitchen.


We went shopping for knobs for the cabinets at PlacaCentro Masisa in La Libertad.



And when we took the knobs to the Neptuno, we were greeted with new tiles in the entry.

Today is 5 weeks from the day they started on the remodel.