Hanging on.
The painters worked on
the front of our balcony today, sealing the concrete and then painting.
The painters also worked on
smoothing spots and giving ceilings and walls a second coat.
We talked Jorge into painting this concrete stand that was left by the previous owner. It should make a nice accent piece in the corner next to the front door.
Carpentero sprayed a sealing finish
on door jambs and worked on the cabinet in the guest bathroom.
Tiles were cut for entry floor.
Grout was applied on bedroom floor
and wiped.
More work was done in the kitchen, a
jigsaw was needed for smaller details.
The kitchen sinks were installed. They don't sell a double sink here without a dish drain attached.
The wine rack was delivered and will
be installed above the refrigerator.
Can you tell a difference in color
between our new windows on the 8th floor and the windows on the
floors above us?
Wow, really coming together. It looks great!
ReplyDeleteThanks! Every day is closer. It's really exciting!
DeleteOne can't tell the difference in the windows from the street. CK
ReplyDeleteThey must have decided they could live with it since we haven't heard anything more. :)
Delete